Assign Work Order scheduling to multiple ressources

$
0
0

Hello,

Is it possible to associate a work order with several resources?

For example, I want to assign a WO to John, Donald, Tom and the A1 truck. I would like to see in the planner that all its resources are reserved.

Microsoft has introduced the concept of Crew. However, this does not correspond to my need because I should have as many Crews as I have the possibility of combining resources. If I repeat my previous example John, Donald, Tom, Tom and A1 truck are a crew. But I could have another Crew with the A2, A3, A4 truck or Donald without John or Tom without Donald, etc.

Thank you in advance for your answer.